Two pieces of agency research on Brisbane industrial property came out in the second half of November 2026, and they point the same way. Cushman & Wakefield's Q3 2026 research, reported on 23 November, expects just over 300,000 square metres of new industrial floorspace to be delivered in Brisbane in 2026. That is the lowest annual supply since 2018 and well below the 10 year average of about 430,000 square metres. Only 115,000 square metres of speculative space is identified for 2027.
I think that matters for anyone looking at an industrial project in South East Queensland, because thin supply is the case for building, and rising costs and a 4.85 per cent cash rate are the case for being careful about how the build is funded.
What the figures show
The vacancy numbers depend on who is counting. Cushman & Wakefield put Brisbane vacancy at 3.1 per cent in the September quarter, down from 3.5 per cent, with the South submarket at 2.6 per cent and the M1 corridor at just 1.7 per cent. Knight Frank's Q3 2026 report, covered on 18 November, put Brisbane vacancy at 4.2 per cent, up from 3.7 per cent, as more space came back to the market. Different methods, different numbers, but both describe a market that is tight by historical standards.
Rents have moved with it. Cushman & Wakefield has average Brisbane prime rents at $190 per square metre a year, up 4 per cent over the year, with the M1 corridor averaging $185. Knight Frank reports prime and secondary rents up 10.0 per cent and 9.5 per cent over 12 months. Land values for one to five hectare sites averaged about $722 per square metre across Brisbane, but the M1 corridor between Brisbane and the Gold Coast rose about 20 per cent over the year on owner occupier demand.
The research also points to where demand sits. The strongest competition is expected below 10,000 square metres, and more occupiers may need to pre-lease or commit earlier as good space gets harder to find.
Why thin supply does not make a build easy to fund
Low vacancy helps the leasing story. It does not change the cost side. WT's November report forecasts Brisbane building cost escalation of 8.0 per cent in 2027 and 10.0 per cent in 2028. Land on the M1 corridor is dearer than it was a year ago. The Reserve Bank lifted the cash rate to 4.85 per cent on 3 November, so carrying a site and a build costs more.
So the question a credit committee asks is not whether the market is tight. It is whether this project, at this land price and this build cost, still leaves enough margin if leasing takes longer or rents land below the feasibility.
What a lender looks for
From my experience, an industrial construction facility in SEQ comes down to a handful of questions.
**Is there a lease?** A signed pre-lease from a tenant of suitable standing lets a lender look at income and value on completion. A speculative build is a leasing risk, so expect more equity, a lower loan to cost and a larger interest allowance.
**Is the land right?** Zoning, flood and overlay constraints, access to the motorway network and whether the lot is serviced. Trunk services and civil works can be a large part of the budget on a raw site.
**Is the cost real?** An independent quantity surveyor's estimate with a realistic contingency, and a builder with the balance sheet to finish.
**Does the unit size match demand?** Leasing evidence for the size being built matters more than a headline vacancy rate. Smaller strata or multi-unit schemes can also sell to owner occupiers, which gives a second exit.
**Does the end value hold?** The total debt, including capitalised interest, should sit comfortably inside a valuation on completion that does not rely on the best rent or yield in the market.
An illustrative vacancy test
As a simple illustration, take a 5,000 square metre speculative warehouse with an illustrative total cost of $14 million. At an illustrative rent of $185 per square metre, it earns about $925,000 a year once leased, a yield on cost of about 6.6 per cent. If the loan is 65 per cent of cost, or $9.1 million, at an illustrative 9 per cent a year, interest is about $819,000 a year. Six months without a tenant after completion means about $462,500 of rent not received and about $409,500 of interest still running, or roughly $872,000 in total. These figures are arithmetic only, not a quote or a market rate.
That is the number a lender wants to see covered, by equity, an interest allowance or a pre-lease, before the first progress draw.
How I'd approach it
If I were looking at an industrial build in Brisbane, Logan or the northern Gold Coast, I would want the leasing evidence, the cost estimate and the funding structure lined up before committing to the land. A pre-lease does for an industrial project what presales do for a residential one.
I wrote more on how lenders size a facility in Loan to Cost and Loan to Value, on funding a site before approval in Land and Site Acquisition Finance Before DA Approval, on progress draws in Construction Finance in Queensland, and on building without presales in No-Presale and Low-Presale Development Finance. For Brisbane and SEQ funding options, see private lending in Brisbane and development finance at Blended Ventures.
None of this is a recommendation to borrow, lend, invest or sell. Every site and project is different.
Sources
WT Partnership, Australian Construction Market Conditions Report November 2026, Brisbane
Reserve Bank of Australia, Statement by the Monetary Policy Board (3 Nov 2026)
Personal views, not financial advice.
Key questions
How much new industrial space is Brisbane expected to deliver in 2026?
Cushman & Wakefield's Q3 2026 Brisbane research, reported on 23 November 2026, expects just over 300,000 square metres of new industrial floorspace in 2026. That is the lowest annual supply since 2018 and well below the 10 year average of 430,000 square metres. Only 115,000 square metres of speculative space is identified for 2027.
What is the industrial vacancy rate in Brisbane?
It depends on the measure. Cushman & Wakefield put Brisbane vacancy at 3.1 per cent in the September quarter 2026, down from 3.5 per cent, with the M1 corridor at 1.7 per cent. Knight Frank's Q3 2026 report, covered on 18 November 2026, put it at 4.2 per cent, up from 3.7 per cent. Both describe a market that is tight by historical standards.
Does a lender need a pre-lease to fund an industrial development?
Not always, but it changes how the facility is sized. With a signed lease from a tenant of suitable standing, a lender can look at the income and the value on completion. Without one, the lender is underwriting a leasing risk, so it usually wants more equity, a lower loan to cost, a larger interest allowance and a credible plan for the vacancy period.
What does a lender look at in an SEQ industrial build?
In my experience the main questions are land value and zoning, whether the site is serviced, an independent cost estimate with contingency, the builder and contract, leasing evidence for the size of unit being built, and whether the finished asset still covers the debt if rents or yields move against the plan.
Who is this relevant to?
Developers, owner occupiers, commercial property owners and their advisers looking at industrial projects in Brisbane, the Gold Coast and wider South East Queensland. It is general commentary, not advice to borrow, lend, invest or sell.
Share this article
The right
conversation
changes things.
For advisory engagements, commercial opportunities and international collaboration, get in touch directly.
Start a conversation